GCM-Final | 4/22/2011 | 4/25/2011 | 4/25/2011 | A | PASS |
Dixie Fellows
|
|
|
FinalJohn @ ###-####...signed the card
|
GCM-Rough In & Pressure Test | 2/25/2011 | 2/28/2011 | 2/28/2011 | A | PASS |
Dixie Fellows
|
|
|
Rough-In & Pressure TestJon @ ###-####Call in advancePM Inspection Please...r/i and 60lb gas ok
|
GCM-Rough-in | 2/23/2011 | 2/24/2011 | 2/24/2011 | A | NR |
Alan Hauser
|
|
|
need pressure test on gasline and all exhaust duct over 6' in length vertically needs support
|