GCM-Rough-in | 9/27/2012 | 9/28/2012 | 9/28/2012 | A | DONE |
Dixie Fellows
|
|
|
8:30... ###-#### paint booth...i called Leon and this inspection was already done under gcm11-00083 and finaled by alan hauser...this permit should be cancelled
|
GCM-Final | 9/26/2012 | 9/27/2012 | 9/27/2012 | P | PEND |
Dixie Fellows
|
|
|
###-#### See MEC2###-####3 for other inspection activity on this project....he already left for the day...so i rescheduled for fri am at 8:30
|