GCM-Final | 7/28/2011 | 7/29/2011 | 7/29/2011 | A | PASS |
Dixie Fellows
|
|
|
FinalBryan @ ###-####Call for access...air balance ok
|
GCM-Final | 6/9/2011 | 6/10/2011 | 6/10/2011 | A | PASS |
Dixie Fellows
|
|
|
Rough-In & Pressure TestBrian @ ###-####Call for access...r/i and 20lb gas ok...duct blaster approved and attached to the furnace
|
GCM-Rough In & Pressure Test | 6/8/2011 | 6/9/2011 | 6/9/2011 | A | FAIL |
Dixie Fellows
|
|
|
Rough-In & Pressure TestBrian @ ###-####Call for access New Mechanical J reviewed and approved by Troy James 6/8/2011....new manual J. not on site
|
GCM-Rough In & Pressure Test | 6/6/2011 | 6/7/2011 | 6/7/2011 | A | FAIL |
Dixie Fellows
|
|
|
Rough-In/Pressure TestBrian @ ###-####Call for access...gas failed...equipment and ductwork doesn't match manual j.
|