GCM-Final | 10/21/2011 | 10/24/2011 | 10/24/2011 | A | PASS |
Dixie Fellows
|
|
|
Debbie @ ###-####Call for access...air balance ok...signed the card
|
GCM-Rough In & Pressure Test | 8/23/2011 | 8/24/2011 | 8/24/2011 | A | PASS |
Dixie Fellows
|
|
|
Debbie @ ###-####Duct Blast Test set for 9 a.m. - Must confirm with Inspector...r/i ok...20lb gas ok...f/p ok...duct blaster ok
|
GCM-Rough In & Pressure Test | 8/18/2011 | 8/19/2011 | 8/19/2011 | A | FAIL |
Dixie Fellows
|
|
|
Debbie @ ###-####Duct Blast Test at 2 pm...no manual j on site..threre are no building plans on site either...no access to attic furnace..fir out wood where dryer vent is smashed..I have ask you to call me the day before to schedule the duct blaster test, so I can make sure I'm available
|
GCM-Rough-in | 8/16/2011 | 8/16/2011 | 8/16/2011 | P | FAIL |
Dixie Fellows
|
|
|
debbie - duct blast test 2-3 pm Phone #: ###-####...job not ready..no licensed journeyman on site..no manual j on site
|