GCM-Final | 9/7/2011 | 9/7/2011 | 9/7/2011 | P | PASS |
Dixie Fellows
|
|
|
gas line only
|
GCM-Pressure Test | 9/7/2011 | 9/7/2011 | 9/7/2011 | P | PASS |
Dixie Fellows
|
|
|
brian will call when test is holding...20lb gas test to existing f/p ok
|
GCM-Rough In & Pressure Test | 9/6/2011 | 9/7/2011 | 9/7/2011 | A | PEND |
Dixie Fellows
|
|
|
Brian @ ###-####Call in advance...brian didn't know he needed to have a test on..I rescheduled for this pm to give him time to take care of it
|