GCM-Final | 11/21/2011 | 11/23/2011 | 11/25/2011 | A | PASS |
Alan Hauser
|
|
|
job finaled per alan
|
GCM-Rough In & Pressure Test | 9/21/2011 | 9/22/2011 | 9/23/2011 | A | PASS |
Bill VanDegrift
|
|
|
Debbie @ ###-####Duct Blast Test at 9 am ri 20# and duct blaster test ok
|
GCM-Rough In & Pressure Test | 9/20/2011 | 9/21/2011 | 9/22/2011 | A | DONE |
Bill VanDegrift
|
|
|
Debbie @ ###-####Duct Blast Test @ 9 am
|
GCM-Rough In & Pressure Test | 9/20/2011 | 9/21/2011 | 9/21/2011 | A | PART |
Bill VanDegrift
|
|
|
Debbie @ ###-####Duct Blast Test @ 9 am ACCA report required for inspection. duct blaster test failed, provide passage way from attic access to equipment platform, ductwork and equipment sizing ok, 20# test ok.
|