GCM-Final | 2/21/2012 | 2/22/2012 | 2/22/2012 | A | PASS |
Alan Hauser
|
|
|
|
GCM-Final | 1/19/2012 | 1/20/2012 | 1/20/2012 | A | PART |
Dixie Fellows
|
|
|
Erin @ ###-####...20lb gas ok...temp occ. ok...ok to move in and hook up equipment...aaron will call for final once that is done
|
GCM-Rough-in | 1/19/2012 | 1/19/2012 | 1/19/2012 | A | PART |
Dixie Fellows
|
|
|
aaron...venting ok...pressure test existing line...will check connections to equipment next week
|
GCM-Final | 1/17/2012 | 1/18/2012 | 1/18/2012 | A | NR |
Dixie Fellows
|
|
|
Erin @ ###-####...need manuf specs on all hoods and new equipment...need info from engineer regarding make-up air and comb air....btu load on any gas
|