GCM-Final | 3/27/2012 | 3/27/2012 | 3/27/2012 | P | PASS |
Dixie Fellows
|
|
|
no new equipment...meter change only
|
GCM-Pressure Test | 3/27/2012 | 3/27/2012 | 3/27/2012 | P | PASS |
Dixie Fellows
|
|
|
meter change...20lb gas ok
|
GCM-Rough In & Pressure Test | 3/26/2012 | 3/27/2012 | 3/27/2012 | P | PASS |
Dixie Fellows
|
|
|
Matt @ ###-####...i rescheduled this for a pressure test and a final
|