GCM-Final | 9/14/2012 | 9/17/2012 | 9/17/2012 | P | PASS |
Dixie Fellows
|
|
|
Rob @ ###-#### PM inspection requested.
|
GCM-Rough In & Pressure Test | 8/6/2012 | 8/6/2012 | 8/6/2012 | P | PASS |
Dixie Fellows
|
|
|
Rob @ ###-#### Inspection for this afternoon requested....r/i and 20lb gas ok...duct blaster ok..f/p ok
|
GCM-Rough In & Pressure Test | 8/2/2012 | 8/3/2012 | 8/3/2012 | A | FAIL |
Dixie Fellows
|
|
|
Bonnie @ ###-#### Air Test is at 11 a.m....no manual J on site ( i ask the builder)..bath exhaust not done...need 30" working space at front of furnace...complete electrical for attic furnace
|