GCM-Final | 12/10/2012 | 12/11/2012 | 12/11/2012 | A | PASS |
Alan Hauser
|
|
|
|
GCM-Rough In & Pressure Test | 8/20/2012 | 8/21/2012 | 8/21/2012 | A | DONE |
Dixie Fellows
|
|
|
Debbie @ ###-####....this job was already passed by alan h. on the 20th
|
GCM-Rough In & Pressure Test | 8/16/2012 | 8/17/2012 | 8/20/2012 | P | PASS |
Alan Hauser
|
|
|
20# and duct blast test done
|
GCM-Rough In & Pressure Test | 8/10/2012 | 8/13/2012 | 8/13/2012 | A | FAIL |
Dixie Fellows
|
|
|
Debbie @ ###-####.....gas not done..f/p not vented...duct blaster not done
|