GCM-Final | 8/20/2012 | 8/21/2012 | 8/21/2012 | P | PASS |
Dixie Fellows
|
|
|
Jeremy @ ###-#### PM inspection requested..signed the card
|
GCM-Final | 8/16/2012 | 8/16/2012 | 8/16/2012 | A | PART |
Dixie Fellows
|
|
|
rtu's are connected to gas and regs in place...waiting on other heating company so I can final them both
|
GCM-Rough In & Pressure Test | 8/14/2012 | 8/14/2012 | 8/14/2012 | P | PART |
Dixie Fellows
|
|
|
Pete @ ###-#### PM Inspection...gas only...60lb gas to new rtu's on roof ok
|