GCM-Final | 11/9/2012 | 11/9/2012 | 11/9/2012 | P | PASS |
Bill VanDegrift
|
|
|
Sherri @ ###-####
|
GCM-Final | 10/30/2012 | 10/31/2012 | 10/31/2012 | A | FAIL |
Dixie Fellows
|
|
|
###-#### or ###-####....air balance equipment info doesn't match manual J on site...need to disconnect all equipment and test gas line
|
GCM-Final | 10/17/2012 | 10/17/2012 | 10/18/2012 | P | FAIL |
Dixie Fellows
|
|
|
Sharie @ ###-####..ductwork doesn't match the manual J..needs to call and talk to troy J about the design...duct blaster and air balance need to be done after the new manual J approval
|
GCM-Final | 10/4/2012 | 10/5/2012 | 10/5/2012 | A | NR |
Dixie Fellows
|
|
|
###-####...need a manual J...need to treat as a complete r/i inspection..will need to see all ductwork to match plan..access to see dryer vent ..access to dampers...duct blaster, air balance..and a GAS TEST
|