GCM-Final | 6/17/2013 | 6/18/2013 | 6/18/2013 | A | PASS |
Dixie Fellows
|
|
|
Isaac ###-#### This was already finalled/scope of work changed. Only need inspector to sign off on gas meter tag...THIS WAS ALREADY DONE
|
GCM-Final | 4/30/2013 | 4/30/2013 | 4/30/2013 | P | PASS |
Dixie Fellows
|
|
|
Odie ###-####...this permit was for gas only...there was no equipment installed or inspected under this permit
|
GCM-Pressure Test | 4/25/2013 | 4/25/2013 | 4/25/2013 | P | PASS |
Dixie Fellows
|
|
|
60lb test from west to east building ok..all outside line tested
|
GCM-Pressure Test | 4/24/2013 | 4/25/2013 | 4/25/2013 | A | FAIL |
Dixie Fellows
|
|
|
Louis ###-####...need a 60lb test
|
GCM-Pressure Test | 4/4/2013 | 4/4/2013 | 4/4/2013 | P | PART |
Dixie Fellows
|
|
|
Louis ###-####...all u/g pipe in trench ok for cover...they will call for the pressure test next week
|