GCM-Final | 7/25/2013 | 7/26/2013 | 7/26/2013 | A | CANC |
Dixie Fellows
|
|
|
Oleg ###-####...already done
|
GCM-Final | 6/18/2013 | 6/19/2013 | 6/19/2013 | P | PASS |
Dixie Fellows
|
|
|
Oleg ###-#### call 1 hour before
|
GCM-Final | 6/6/2013 | 6/6/2013 | 6/6/2013 | P | FAIL |
Dixie Fellows
|
|
|
Mani Phone #: ###-####...air balance report not correct...need return and supply static pressures and total s.p....i called oleg
|
GCM-Final | 6/4/2013 | 6/5/2013 | 6/5/2013 | P | FAIL |
Dixie Fellows
|
|
|
Call for access Phone #: ###-####...need comb air for w/h...need shield on w/h flue..secondary drain location for furnace..need access to attic..need certification # on air-balance and complete totals
|
GCM-Rough In & Pressure Test | 4/24/2013 | 4/23/2013 | 4/24/2013 | P | CANC |
Dixie Fellows
|
|
|
Oleg ###-####...inspection done on 4-23
|
GCM-Rough In & Pressure Test | 4/24/2013 | 4/22/2013 | 4/24/2013 | P | CANC |
Dixie Fellows
|
|
|
Oleg ###-#### please give one hour advance notice if possible...already approved on 4-23
|
GCM-Rough In & Pressure Test | 4/23/2013 | 4/23/2013 | 4/23/2013 | P | PASS |
Dixie Fellows
|
|
|
Please call 1 hour in advance if possible-Oleg Phone #: ###-####...r/i and 20lb gas ok...f/p ok
|
GCM-Pellet or Wood Stove | 4/12/2013 | 4/12/2013 | 4/15/2013 | P | PASS |
Dixie Fellows
|
|
|
Oleg @ ###-####...F/P OK
|
GCM-Rough In & Pressure Test | 4/12/2013 | 4/12/2013 | 4/15/2013 | P | FAIL |
Dixie Fellows
|
|
|
Oleg @ ###-####...screw penetrating inner liner of b-vent (REPLACE THAT SECTION)..where are the dampers?..complete condensate at furnace..where is the secondary drain?..NO MANUAL J ON SITE
|