GCM-Final | 12/10/2013 | 12/11/2013 | 12/11/2013 | P | PASS |
Dixie Fellows
|
|
|
Oleg ###-#### please give one hour notice if possible
|
GCM-Final | 7/31/2013 | 8/1/2013 | 8/1/2013 | A | FAIL |
Dixie Fellows
|
|
|
Oleg ###-####...waited 20 minutes for oleg to bring a ladder..ran out of time and had to leave
|
GCM-Final | 7/29/2013 | 7/30/2013 | 7/30/2013 | A | NR |
Dixie Fellows
|
|
|
Oleg ###-####...need access to furnace
|
GCM-Final | 6/3/2013 | 5/30/2013 | 6/3/2013 | P | CANC |
Dixie Fellows
|
|
|
###-####...per barb
|
GCM-Pressure Test | 5/30/2013 | 5/30/2013 | 5/30/2013 | P | NR |
Dixie Fellows
|
|
|
Angie ###-####
|
GCM-Rough-in | 4/25/2013 | 4/25/2013 | 4/25/2013 | P | PASS |
Dixie Fellows
|
|
|
Oleg ###-####...r/i and 20lb gas ok..f/p ok..duct blaster ok
|
GCM-Rough-in | 4/24/2013 | 4/24/2013 | 4/24/2013 | P | CANC |
Dixie Fellows
|
|
|
Oleg Phone #: ###-####...duplicate request
|
GCM-Rough In & Pressure Test | 4/24/2013 | 4/23/2013 | 4/24/2013 | P | PART |
Dixie Fellows
|
|
|
Oleg ###-####...no manual j on site...20lb gas ok..f/p ok
|