GCM-Final | 11/12/2013 | 11/12/2013 | 11/12/2013 | P | PASS |
Dixie Fellows
|
|
|
Eric ###-#### call first
|
GCM-Final | 9/27/2013 | 9/30/2013 | 9/30/2013 | A | FAIL |
Dixie Fellows
|
|
|
Kurt ###-####...need upper and lower 10x10" comb air to w/h...no air-balance on site
|
GCM-Rough-in | 8/1/2013 | 8/1/2013 | 8/2/2013 | P | PASS |
Dixie Fellows
|
|
|
Garrett ###-####...r/i and 20lb gas ok
|
GCM-Rough-in | 7/31/2013 | 7/31/2013 | 7/31/2013 | A | NR |
Dixie Fellows
|
|
|
###-####,,,NO MANUAL J ON SITE
|
GCM-Final | 7/30/2013 | 7/31/2013 | 7/31/2013 | A | CANC |
Dixie Fellows
|
|
|
###-####...should have been a r/i
|
GCM-Pressure Test | 5/22/2013 | 5/22/2013 | 5/22/2013 | P | PASS |
Dixie Fellows
|
|
|
Kirk Phone #: ###-####...60lb u/g ok
|