GCM-Final | 12/24/2013 | 12/26/2013 | 12/26/2013 | P | PASS |
Bill VanDegrift
|
|
|
meet dixie at site for a conference
|
GCM-Final | 12/24/2013 | 12/26/2013 | 12/26/2013 | P | PASS |
Dixie Fellows
|
|
|
meet bill at site for a conference...this job is ok for final
|
GCM-Final | 12/24/2013 | 12/24/2013 | 12/24/2013 | P | PEND |
Dixie Fellows
|
|
|
There is a garage code...i rescheduled this to meet bill at the site for a conference
|
GCM-Final | 12/20/2013 | 12/23/2013 | 12/23/2013 | A | FAIL |
Dixie Fellows
|
|
|
Jordan ###-#### call first....w/h flue to be 2' higher than vertical wall within 8'
|
GCM-Rough-in | 10/7/2013 | 10/7/2013 | 10/7/2013 | P | PASS |
Dixie Fellows
|
|
|
Jennifer ###-####...R/I OK...20LB GAS OK...F/P OK PER TROY JAMES...FURNACE MODEL # WONT MATCH MANUAL J BUT THAT IS OK PER TROY JAMES ON BOTH UNITS
|
GCM-Rough-in | 10/1/2013 | 10/2/2013 | 10/2/2013 | A | PART |
Dixie Fellows
|
|
|
Jennifer ###-#### Call prior to arrival, needs observe for duct blast...20lb gas ok...duct blast ok...need the correct manual J and f/p can't terminate sidewall due to lot line per dave H.
|