GCM-Final | 1/16/2014 | 1/16/2014 | 1/16/2014 | P | PASS |
Dixie Fellows
|
|
|
FINAL OK..NO SIGN OFF CARD ON SITE
|
GCM-Final | 1/9/2014 | 1/10/2014 | 1/10/2014 | A | PART |
Dixie Fellows
|
|
|
Brandon ###-####...THIS IS FOR A TEMPORARY OCCUPANCY ONLY...NEED TO FINISH CONDENSATES ON BACK WALL TO INSULATE THEM (3)
|
GCM-Rough-in | 1/8/2014 | 1/9/2014 | 1/9/2014 | A | PART |
Dixie Fellows
|
|
|
bRANDON ###-####..ok for cover...NEED TO RUN PRIMARY CONDENSATES ON ALL FURNACES
|
GCM-Rough-in | 12/30/2013 | 12/31/2013 | 12/31/2013 | A | PART |
Dixie Fellows
|
|
|
Luke ###-####..ok to cover resstroom lids
|