GCM-Final | 5/22/2014 | 5/23/2014 | 5/23/2014 | A | PASS |
Dixie Fellows
|
|
|
Don ###-####
|
GCM-Rough In & Pressure Test | 5/8/2014 | 5/9/2014 | 5/9/2014 | P | PASS |
Troy James
|
|
|
###-#### re-inspect 20# test to meter
|
GCM-Rough In & Pressure Test | 4/29/2014 | 4/29/2014 | 4/29/2014 | P | PART |
Dixie Fellows
|
|
|
Don ###-####..20LB TEST GOING INTO BUILDING OK...U/G TEST FAILED (LEAK)...WRONG TYPE OF FLUE USED ON UNIT HEATER PER MANUF
|