GCM-Final | 8/26/2014 | 8/27/2014 | 8/27/2014 | A | PASS |
Dixie Fellows
|
|
|
Oleg ###-####
|
GCM-Final | 8/22/2014 | 8/25/2014 | 8/25/2014 | A | FAIL |
Dixie Fellows
|
|
|
dan ###-####..need lower comb air at w/h
|
GCM-Rough-in | 6/12/2014 | 6/13/2014 | 6/13/2014 | A | DONE |
Dixie Fellows
|
|
|
this job was already inspected on 5-19
|
GCM-Pressure Test | 6/12/2014 | 6/13/2014 | 6/13/2014 | A | DONE |
Dixie Fellows
|
|
|
this job was already inspected
|
GCM-Rough In & Pressure Test | 5/16/2014 | 5/19/2014 | 5/19/2014 | A | PASS |
Dixie Fellows
|
|
|
Oleg ###-####...r/i and 20lb gas ok
|
GCM-Rough In & Pressure Test | 5/15/2014 | 5/15/2014 | 5/15/2014 | P | FAIL |
Dixie Fellows
|
|
|
pegged the gas guage..need transfer grilles..protect condensate lines in attic above insulation
|