GCM-Final | 10/23/2014 | 10/23/2014 | 10/23/2014 | P | PASS |
Bill VanDegrift
|
|
|
Oleg ###-#### final ok
|
GCM-Final | 10/22/2014 | 10/22/2014 | 10/22/2014 | P | FAIL |
Alan Hauser
|
|
|
no air balance report
|
GCM-Final | 10/15/2014 | 10/15/2014 | 10/16/2014 | P | FAIL |
Dixie Fellows
|
|
|
need to trim outside f/p..air balance ok
|
GCM-Rough-in | 8/13/2014 | 8/13/2014 | 8/13/2014 | A | PASS |
Alan Hauser
|
|
|
5# on flue and 20# on gas
|
GCM-Rough In & Pressure Test | 8/12/2014 | 8/12/2014 | 8/12/2014 | P | FAIL |
Dixie Fellows
|
|
|
Oleg ###-####...gas guage won't zero..tie 6" fresh air to return air plenum at furnace..need test on flue
|