GCM-Final | 9/30/2014 | 9/30/2014 | 9/30/2014 | P | PASS |
Alan Hauser
|
|
|
|
GCM-Pressure Test | 9/29/2014 | 9/30/2014 | 9/30/2014 | A | PASS |
Alan Hauser
|
|
|
5# on flue
|
GCM-Pressure Test | 9/29/2014 | 9/29/2014 | 9/29/2014 | P | NR |
Dixie Fellows
|
|
|
Ashley Heating ###-####..should have been scheduled for tues am
|
GCM-Final | 9/25/2014 | 9/25/2014 | 9/25/2014 | P | FAIL |
Chad Schwendiman
|
|
|
Installer Mike ###-#### - need to pressure test pvc flue.
|
GCM-Final | 9/22/2014 | 9/23/2014 | 9/23/2014 | A | FAIL |
Dixie Fellows
|
|
|
Mike ###-#### installer, please call to meet onsite. Ashley Heating ###-####..doors locked
|