GCM-Final | 2/19/2015 | 2/23/2015 | 2/23/2015 | A | PASS |
Dixie Fellows
|
|
|
Dylan ###-####
|
GCM-Rough In & Pressure Test | 10/16/2014 | 10/17/2014 | 10/17/2014 | A | PART |
Dixie Fellows
|
|
|
###-####..need transfer grilles..run gas line into both f/p's...daniel will bring approved man j to job site...20lb gas ok...furn and w/h flue tests ok
|
GCM-Rough In & Pressure Test | 10/16/2014 | 10/16/2014 | 10/16/2014 | P | FAIL |
Dixie Fellows
|
|
|
###-####..need the new manual j's
|
GCM-Rough In & Pressure Test | 10/15/2014 | 10/16/2014 | 10/16/2014 | A | FAIL |
Dixie Fellows
|
|
|
A1 April ###-####..unable to reach guages..need manual j on site
|