GCM-Final | 10/28/2015 | 10/27/2015 | 10/28/2015 | P | DONE |
Chad Schwendiman
|
|
|
Dave ###-#### - bill all ready finaled this on 10-27-15
|
GCM-Final | 10/27/2015 | 10/27/2015 | 10/27/2015 | P | PASS |
Bill VanDegrift
|
|
|
final ok with service switch at the furnace
|
GCM-Rough-in | 9/2/2015 | 9/2/2015 | 9/2/2015 | P | PASS |
Alan Hauser
|
|
|
|
GCM-Rough-in | 6/23/2015 | 6/24/2015 | 6/24/2015 | A | FAIL |
Dixie Fellows
|
|
|
David ###-####..need to remove wood framing from top of f/p where marked..need to install outside air to firebox
|
GCM-Rough-in | 6/23/2015 | 6/23/2015 | 6/23/2015 | P | FAIL |
Dixie Fellows
|
|
|
David ###-#### - fireplace..need manuf specs on site
|
GCM-Rough-in | 9/24/2014 | 9/24/2014 | 9/24/2014 | P | PASS |
Alan Hauser
|
|
|
20# and 5# on flue
|