GCM-Final | 12/15/2014 | 12/16/2014 | 12/16/2014 | A | PASS |
Dixie Fellows
|
|
|
Jeff ###-####
|
GCM-Rough-in | 10/31/2014 | 10/31/2014 | 10/31/2014 | P | PASS |
Bill VanDegrift
|
|
|
Brian ###-#### ri 20# gas and 5# flue tests ok
|
GCM-Rough-in | 10/30/2014 | 10/30/2014 | 10/31/2014 | P | PASS |
Bill VanDegrift
|
|
|
Jeff ###-#### ri 20# gas and 5# flue tests ok
|
GCM-Rough-in | 10/29/2014 | 10/30/2014 | 10/30/2014 | A | FAIL |
Troy James
|
|
|
Jeff ###-#### correction notice not completed
|
GCM-Rough-in | 10/27/2014 | 10/28/2014 | 10/28/2014 | P | FAIL |
Troy James
|
|
|
Jeff ###-#### manual j report still does not match installation. Need to remove 12" riser and replace with 8" supply to kitchen. Need balance damper to all supply runs and insulate metal return plenum in garage.
|