GCM-Final | 12/5/2014 | 12/8/2014 | 12/8/2014 | A | PASS |
Troy James
|
|
|
Randy ###-#### - final on hood
|
GCM-Rough-in | 11/24/2014 | 11/25/2014 | 11/25/2014 | A | PASS |
Troy James
|
|
|
Randy ###-#### - light inspection ok first layer of fire wrap and some of second layer
|
GCM-Rough-in | 11/20/2014 | 11/21/2014 | 11/21/2014 | A | PASS |
Troy James
|
|
|
Randy ###-#### - requesting insp. for duct and light ok to wrap grease duct drop and horizontal runs except with need to verify weld at hood and and horizontal to vertical connection
|
GCM-Rough-in | 11/18/2014 | 11/19/2014 | 11/20/2014 | P | PEND |
Dixie Fellows
|
|
|
Randy ###-#### - requesting a consult and inspection. ..randy will reschedule
|
GCM-Rough-in | 11/17/2014 | 11/18/2014 | 11/18/2014 | A | PEND |
Dixie Fellows
|
|
|
Randy ###-#### - requesting a consult and inspection..randy couldn't meet me in the a.m....he will reschedule for wed am
|