GCM-Final | 4/8/2015 | 4/9/2015 | 4/9/2015 | A | PASS |
Chad Schwendiman
|
|
|
Oleg ###-#### - requested late AM insp.
|
GCM-Rough In & Pressure Test | 1/16/2015 | 1/16/2015 | 1/16/2015 | P | PASS |
Troy James
|
|
|
Oleg ###-#### 20# gas test. No access to furnace to verify equipment
|
GCM-Rough In & Pressure Test | 1/15/2015 | 1/15/2015 | 1/15/2015 | P | NR |
Dixie Fellows
|
|
|
Flue pressure test for high eff furnace installation. Call ahead to Eric @ ###-#### to coordinate inspection time. Phone #: ###-#### >> Inspection requested via web by Angie Maguire...oleg called and cancelled
|
GCM-Rough In & Pressure Test | 1/14/2015 | 1/14/2015 | 1/14/2015 | P | FAIL |
Dixie Fellows
|
|
|
Oleg ###-#### ...no man j on site
|