GCM-Final | 10/19/2015 | 10/19/2015 | 10/19/2015 | P | PASS |
Bill VanDegrift
|
|
|
Shawn ###-####
|
GCM-Rough In & Pressure Test | 6/10/2015 | 6/11/2015 | 6/11/2015 | A | PASS |
Dixie Fellows
|
|
|
Shawn ###-#### - key in dryer vent or door open...20lb gas ok
|
GCM-Rough In & Pressure Test | 6/9/2015 | 6/9/2015 | 6/9/2015 | P | FAIL |
Dixie Fellows
|
|
|
Shawn ###-#### - key in dryer vent or door open...guage has a leak..
|
GCM-Rough In & Pressure Test | 5/22/2015 | 5/22/2015 | 5/22/2015 | P | FAIL |
Dixie Fellows
|
|
|
Shawn ###-#### - door is open...need a 30lb guage with a 20lb test on gas line...need to test furn with with a 10lb guage and a 5 lb test...need upper comb air for furn...need secondary drain at furnace..a.c to be level with rest of driveway and on a 3" pad
|
GCM-Rough In & Pressure Test | 5/20/2015 | 5/21/2015 | 5/21/2015 | A | NH |
Dixie Fellows
|
|
|
Shawn ###-#### - requested call ahead...called and left a message at 9:03...no return call as of 11:32
|