GCM-Final | 9/18/2015 | 9/18/2015 | 9/18/2015 | P | PASS |
Dixie Fellows
|
|
|
James ###-####
|
GCM-Pressure Test | 7/28/2015 | 7/29/2015 | 7/29/2015 | A | PASS |
Alan Hauser
|
|
|
60# on whole system
|
GCM-Pressure Test | 7/28/2015 | 7/28/2015 | 7/28/2015 | P | FAIL |
Dixie Fellows
|
|
|
James ###-####...no revised letter from engineer on site...called james 2 times
|
GCM-Pressure Test | 7/7/2015 | 7/7/2015 | 7/7/2015 | P | FAIL |
Dixie Fellows
|
|
|
CONFERENCE ONLY - James ###-#### ..nobody showed up for the conference..gas piping doesn,t meet approved set of plans..need a letter from the engineer approving changes
|
GCM-Final | 7/6/2015 | 7/6/2015 | 7/6/2015 | P | NR |
Dixie Fellows
|
|
|
Chris at office ###-#### or James ###-####..THIS SHOULD HAVE BEEN A PRESSURE TEST...NEED TO MEET INSTALLER TUES AT 1:00 FOR A CONFERENCE
|
GCM-Rough In & Pressure Test | 6/4/2015 | 6/5/2015 | 6/5/2015 | A | FAIL |
Dixie Fellows
|
|
|
James ###-####..need a new revised, approved stamped plan on site
|