GCM-Final | 9/28/2015 | 9/29/2015 | 9/29/2015 | A | PASS |
Dixie Fellows
|
|
|
Vaughn ###-####
|
GCM-Final | 9/15/2015 | 9/16/2015 | 9/16/2015 | A | PART |
Dixie Fellows
|
|
|
Randy ###-####
|
GCM-Final | 9/10/2015 | 9/11/2015 | 9/11/2015 | A | NR |
Dixie Fellows
|
|
|
Randy ###-####
|
GCM-Final | 9/8/2015 | 9/9/2015 | 9/9/2015 | A | PEND |
Dixie Fellows
|
|
|
Randy ###-####..randy will reschedule..we were unable to meet today
|
GCM-Final | 8/10/2015 | 8/11/2015 | 8/11/2015 | A | CANC |
Bill VanDegrift
|
|
|
Randy ###-#### - also requested consult on piping at time of inspection need to complete brewing equipment, fresh air, address deleted unit heaters, hang and seal bath exhaust, insulate refer piping. cooler condensate, 2500 cfm exhaust system in brewing area, hang furnace b-vent, 18" clearance to brewing equipment burner, etc.
|
GCM-Rough-in | 7/27/2015 | 7/28/2015 | 7/28/2015 | A | NR |
Dixie Fellows
|
|
|
Randy ###-####
|