GCP-Final | 3/18/2010 | 3/19/2010 | 3/19/2010 | A | PASS |
Daryl Spivey
|
|
|
Scope of Inspection: Final for Sewer LineContact: Dana ###-####
|
GCP-Final | 3/15/2010 | 3/16/2010 | 3/16/2010 | A | PART |
Daryl Spivey
|
|
|
Scope of Inspection: Final for Sewer Line InspectionContact: Dana ###-#### met with plumber and gave him corrections for installing flammable interceptors.........he will correct and call back in for final...........ds
|
GCP-Water and/or Sewer | 3/11/2010 | 3/11/2010 | 3/11/2010 | P | PART |
Daryl Spivey
|
|
|
dana Phone #: ###-#### test on piping passed..........piping needs to be bedded and talked with Kevin about tank installation requirements. Will meet him at site 3/12 10am............ds
|