GCP-Final | 9/7/2010 | 9/8/2010 | 9/8/2010 | A | PASS |
Daryl Spivey
|
|
|
Scope: FinalContact: Randy @ ###-####
|
GCP-Final | 8/12/2010 | 8/13/2010 | 8/13/2010 | A | FAIL |
Daryl Spivey
|
|
|
Scope: FinalContact: Randy @ ###-#### need 15" clearance minimum from center to side obstruction, lavs need to be tempered per code and coffee and cuppacino machines neep appropriate back flow protection..........ds
|
GCP-Final | 6/1/2010 | 6/2/2010 | 6/2/2010 | A | NR |
Daryl Spivey
|
|
|
Scope of Inspection: FinalContact: Randy @ ###-#### not ready...............ds
|