GCP-Final | 9/9/2010 | 9/10/2010 | 9/10/2010 | A | PASS |
Jim Johnson
|
|
|
Scope: FinalContact: Greg @ ###-#### final on scope of work - rough-in for drain, waste and vent,s and softner connection only
|
GCP- Rough-in | 9/9/2010 | 9/10/2010 | 9/10/2010 | A | PASS |
Jim Johnson
|
|
|
Scope: Rough-InContact: Greg @ ###-####
|
GCP- Rough-in | 8/16/2010 | 8/17/2010 | 8/17/2010 | A | PASS |
Daryl Spivey
|
|
|
Scope: Rough-In (Groundwork)Contact: Gregg @ ###-#### groundwork tested ok.........ds
|