GCP-Final | 7/5/2011 | 7/6/2011 | 7/6/2011 | A | PASS |
Daryl Spivey
|
|
|
FinalGary @ ###-####Call in advance
|
GCP-Final | 6/30/2011 | 7/1/2011 | 7/1/2011 | A | NR |
Daryl Spivey
|
|
|
Final (partial - 7 faucets on back order)Gary @ ###-####Call in advance need temp. water to lavs, not enough done for partial...........ds
|
GCP- Rough-in | 4/18/2011 | 4/19/2011 | 4/19/2011 | A | PASS |
Daryl Spivey
|
|
|
24 hr test ok.............ds
|
GCP- Rough-in | 4/15/2011 | 4/18/2011 | 4/18/2011 | A | PART |
Daryl Spivey
|
|
|
Rough-In (Med Gas)Gary @ ###-#### water and dwv tested ok.........24 hr test started on med gas...............ds
|