GCP-Final | 10/31/2011 | 11/1/2011 | 11/1/2011 | A | PASS |
Daryl Spivey
|
|
|
Brandon @ ###-####
|
GCP- Rough-in | 9/14/2011 | 9/15/2011 | 9/15/2011 | A | PASS |
Daryl Spivey
|
|
|
Brandon @ ###-####PM Inspection
|
GCP-Under Floor | 8/16/2011 | 8/16/2011 | 8/16/2011 | P | PASS |
Daryl Spivey
|
|
|
branden Phone #: ###-####
|
GCP-Water and/or Sewer | 8/16/2011 | 8/16/2011 | 8/16/2011 | A | PASS |
Daryl Spivey
|
|
|
branden - ###-####
|