GCP-Final | 8/31/2012 | 9/4/2012 | 9/4/2012 | A | PASS |
Daryl Spivey
|
|
|
Jason @ ###-####
|
GCP-Final | 8/30/2012 | 8/31/2012 | 8/31/2012 | A | NR |
Daryl Spivey
|
|
|
Randy @ ###-#### not ready...........ds
|
GCP- Rough-in | 7/10/2012 | 7/11/2012 | 7/11/2012 | A | PASS |
Daryl Spivey
|
|
|
Colin @ ###-#### med gas rough in tested ok..........ds
|
GCP- Rough-in | 7/9/2012 | 7/10/2012 | 7/10/2012 | A | PART |
Daryl Spivey
|
|
|
Colin @ ###-#### need to test and inspect med gas.............ds
|
GCP- Rough-in | 6/12/2012 | 6/13/2012 | 6/13/2012 | A | PART |
Daryl Spivey
|
|
|
Colin @ ###-#### water line inside tested ok.............ds
|
GCP-Under Floor | 6/6/2012 | 6/7/2012 | 6/7/2012 | A | PART |
Daryl Spivey
|
|
|
Colin @ ###-#### waste and vent tested ok..........ds
|