GCP-Final | 8/17/2012 | 8/20/2012 | 8/20/2012 | A | PASS |
Daryl Spivey
|
|
|
Everett
|
GCP-Final | 8/16/2012 | 8/17/2012 | 8/17/2012 | A | NR |
Daryl Spivey
|
|
|
Everett @ ###-#### AM inspection requested need to install equipment for final...........ds
|
GCP- Rough-in | 7/30/2012 | 7/31/2012 | 7/31/2012 | A | PASS |
Daryl Spivey
|
|
|
Everrett @ ###-#### AM inspection requested
|
GCP- Rough-in | 7/23/2012 | 7/24/2012 | 7/24/2012 | A | PART |
Bill VanDegrift
|
|
|
Everrett @ ###-#### RESTROOMS OK TO COVER WITH SHOCK ABSORBERS INSTALLED
|
GCP-Under Floor | 6/13/2012 | 6/14/2012 | 6/14/2012 | P | PASS |
Daryl Spivey
|
|
|
Everett @ ###-#### PM Inspection
|