GCP-Final | 10/18/2012 | 10/18/2012 | 10/19/2012 | P | PASS |
Daryl Spivey
|
|
|
Jim @ ###-#### Call in advance - PM Inspection
|
GCP-Final | 10/1/2012 | 10/2/2012 | 10/2/2012 | P | NR |
Daryl Spivey
|
|
|
Jim or Maria @ ###-#### call in advance Afternoon inspection requested temp. set on floor for stand to dry.........call back in when set on stand..........ds
|