GCP-Final | 11/7/2014 | 11/10/2014 | 11/10/2014 | A | PASS |
Bill VanDegrift
|
|
|
Ryan ###-#### final ok with lavs calked to wall
|
GCP-Final | 11/5/2014 | 11/6/2014 | 11/6/2014 | A | PART |
Daryl Spivey
|
|
|
Brandon ###-#### Need to epoxy both lavs as the concrete is porous and causes a health issue.....temporary occupancy ok.......ds
|
GCP- Rough-in | 9/30/2014 | 9/30/2014 | 9/30/2014 | P | PASS |
Daryl Spivey
|
|
|
Brandon ###-####
|
GCP-Under Floor | 9/17/2014 | 9/18/2014 | 9/18/2014 | P | PASS |
Daryl Spivey
|
|
|
ground work inspection requested-###-####
|