GCP-Final | 1/22/2016 | 1/27/2016 | 1/27/2016 | A | PASS |
Bill VanDegrift
|
|
|
Russell ###-#### - final for C of O will call when the breakroom sink waste is repiped to vented trap
|
GCP-Final | 1/13/2016 | 1/14/2016 | 1/14/2016 | A | PART |
Daryl Spivey
|
|
|
Russell ###-#### temp occ ok for areas designated on plan only............ds
|
GCP- Rough-in | 12/16/2015 | 12/17/2015 | 12/17/2015 | P | PASS |
Daryl Spivey
|
|
|
Chris ###-####
|
GCP- Rough-in | 12/13/2015 | 12/11/2015 | 12/14/2015 | A | CANC |
Daryl Spivey
|
|
|
Chris ###-####
|
GCP- Rough-in | 12/13/2015 | 12/10/2015 | 12/14/2015 | P | CANC |
Daryl Spivey
|
|
|
Chris ###-####
|
GCP- Rough-in | 12/10/2015 | 12/11/2015 | 12/11/2015 | A | PART |
Daryl Spivey
|
|
|
chris
|
GCP- Rough-in | 12/9/2015 | 12/10/2015 | 12/10/2015 | P | NR |
Daryl Spivey
|
|
|
Chris ###-####
|
GCP- Rough-in | 12/1/2015 | 12/1/2015 | 12/1/2015 | P | PART |
Daryl Spivey
|
|
|
Mike ###-#### roof drains tested ok..........ds
|
GCP-Under Floor | 9/17/2015 | 9/17/2015 | 9/17/2015 | P | PASS |
Daryl Spivey
|
|
|
Mike 385 -###-####
|
GCP-Under Floor | 9/15/2015 | 9/16/2015 | 9/16/2015 | A | PART |
Daryl Spivey
|
|
|
Mike ###-####
|