GRD-Final | 4/10/2018 | 4/11/2018 | 4/11/2018 | P | PASS |
Jim Sly
|
|
|
Contacts are Don Rye or Jay Hintze - location is Quality Electric office. Phone #: ###-#### Inspection requested via web by Scott Campbell
|
GRD-Final | 4/11/2018 | 4/11/2018 | 4/11/2018 | A | DONE |
Tiffany Lowery
|
|
|
|
FIRE-Final Inspection | 4/5/2018 | 4/6/2018 | 4/10/2018 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Both gates have been modified for the 20' width
At Quality Electric offices. Contact is either Don Rye or Jay Hintze. Phone #: ###-#### Inspection requested via web by Scott Campbell
|
FIRE-Final Inspection | 3/28/2018 | 3/28/2018 | 3/29/2018 | P | FAIL |
Troy Cobbley
|
|
|
Gate issues. If per the project related BLD permit for the shed, one fire dept acces is required then only one gate (the main one) will be required to have the 20' clear width. If per the plans two access points are required then both gates will need the 20' clearance.
Contacts are either Don Rye ###-#### or Jay Hintze ###-#### - inspection site is at Quality Electric location, 5272 W. Irving. Phone #: ###-#### Inspection requested via web by Scott Campbell
|