Final | 10/18/2000 | 10/18/2000 | 10/18/2000 | P | PASS |
Dixie Fellows
|
|
|
somebody will be on site or garage will be open
|
Final | 10/18/2000 | 10/18/2000 | 10/18/2000 | P | PASS |
Dixie Fellows
|
|
|
somebody will be on site or garage will be open
|
Final | 10/2/2000 | 10/3/2000 | 10/3/2000 | A | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 10/02/2000 at 09:07:24. Contact: ###-####. correct unit heater vents 10/3/2000 11:32:41 AM
|
Final | 9/15/2000 | 9/18/2000 | 9/18/2000 | A | FAIL |
|
|
|
Scheduled by a contractor via Hello! on 09/15/2000 at 11:12:33. Contact: ###-####. need to install whole house fan timer, need to add 2-extra heaters in the basement/garage to the orig permit, need make up air installed to the return side at the furnace. c/n issued 9/18/2000 12:14:03 PM
|
Pressure Test | 2/10/2000 | 2/11/2000 | 2/11/2000 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/10/2000 at 11:50:27. Contact: ###-####.
|
Rough-in | 2/10/2000 | 2/11/2000 | 2/11/2000 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/10/2000 at 11:49:42. Contact: ###-####. Work ok, but left correction for clarification of how garage firewall will be maintained. 2/14/00 2:07:13 PM
|