Final | 3/9/2000 | 3/9/2000 | 3/9/2000 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 03/09/2000 at 09:56:10. Contact: ###-####.
|
Pressure Test | 1/18/2000 | 1/18/2000 | 1/18/2000 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 01/18/2000 at 09:42:17. Contact: ###-####. Gas test ok. 1/19/00 11:18:38 AM
|
Rough-in | 1/18/2000 | 1/18/2000 | 1/18/2000 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 01/18/2000 at 09:41:47. Contact: ###-####. R/I ok. 1/19/00 11:18:32 AM
|