Final | 2/10/2000 | 2/10/2000 | 2/10/2000 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 02/10/2000 at 09:07:48. Contact: ###-####.
|
Rough-in | 1/11/2000 | 1/12/2000 | 1/12/2000 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 01/11/2000 at 15:39:08. Contact: ###-####.
|
Rough-in | 1/10/2000 | 1/11/2000 | 1/11/2000 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 01/10/2000 at 15:35:17. Contact: ###-####. Insulate R/H in attic; whole house fan not connected to duct strap up enviro. Exhaust 1/4" sag per foot.
|