Final | 1/21/2000 | 1/24/2000 | 1/24/2000 | A | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 01/21/2000 at 16:34:40. Contact: ###-####.
|
Final | 1/20/2000 | 1/21/2000 | 1/21/2000 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/20/2000 at 13:59:34. Contact: ###-####.
|
Final | 1/17/2000 | 1/18/2000 | 1/18/2000 | P | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 01/17/2000 at 12:30:41. Contact: ###-####. Resize pipe and retest. 1/19/00 11:13:30 AM
|