Final | 5/31/2000 | 6/1/2000 | 6/1/2000 | A | CANC |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 05/31/2000 at 17:04:02. Contact: ###-####. Done by 411 6/1/00 2:37:00 PM
|
Final | 6/1/2000 | 6/1/2000 | 6/1/2000 | A | PASS |
Dixie Fellows
|
|
|
FINAL OK
|
Final | 5/30/2000 | 5/31/2000 | 5/31/2000 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 05/30/2000 at 13:38:37. Contact: ###-####...KIT EXHAUST NOT WORKING
|
Rough-in | 2/2/2000 | 2/3/2000 | 2/3/2000 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/02/2000 at 15:00:21. Contact: ###-####.
|