Final | 3/31/2000 | 4/3/2000 | 4/3/2000 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 03/31/2000 at 16:04:40. Contact: ###-####.
|
Rough-in | 2/4/2000 | 2/7/2000 | 2/7/2000 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 02/04/2000 at 15:18:19. Contact: ###-####.
|
Rough-in | 2/2/2000 | 2/3/2000 | 2/3/2000 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 02/02/2000 at 14:58:38. Contact: ###-####. NEED 1" CLEARANCE IN ATTIC AT BVENT..SEAL R/A GARAGE
|