Final | 3/6/2000 | 3/7/2000 | 3/7/2000 | A | PASS |
Dixie Fellows
|
|
|
###-####
|
Final | 3/3/2000 | 3/6/2000 | 3/6/2000 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 03/03/2000 at 11:54:03. Contact: ###-####. SUPPORT GAS PIPE AT EQUIP
|
Rough-in | 2/1/2000 | 2/2/2000 | 2/2/2000 | A | PASS |
Dixie Fellows
|
|
|
Mike ###-####
|
Rough-in | 2/1/2000 | 2/1/2000 | 2/1/2000 | P | PART |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 02/01/2000 at 08:37:57. Contact: ###-####. pt ok c\n on r\i 2/3/00 7:37:10 AM
|