Pressure Test | 1/21/2000 | 1/24/2000 | 1/24/2000 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 01/21/2000 at 16:55:53. Contact: ###-####. Gas ok. 1/25/00 1:14:06 PM
|
Rough-in | 1/21/2000 | 1/24/2000 | 1/24/2000 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 01/21/2000 at 16:55:34. Contact: ###-####. R/I ok. 1/25/00 1:14:03 PM
|