Final | 2/1/2000 | 2/1/2000 | 2/1/2000 | P | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 02/01/2000 at 09:39:24. Contact: ###-####. NOT READY FOR FINAL
|
Final | 1/28/2000 | 1/28/2000 | 1/28/2000 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 01/28/2000 at 09:13:23. Contact: ###-####. NO ADDRESS POSTED
|
Final | 1/25/2000 | 1/26/2000 | 1/26/2000 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/25/2000 at 06:14:51. Contact: ###-####. Spacer at wall does not have the spacers at the inner collar. 1/26/00 2:43:30 PM
|